Update - Sept 2023Following the previous appeal success a further application for all Reserved Matters was submitted to the Council. The Council failed to engage during the process and did not acknowledge receipt of amended highway plans. The Appellant appealed against the Council's failure to make a decision within the prescribed time as time was running out to lodge an appeal. The Planning Inspector granted permission for all Reserved Matters and once again granted a further Full Award of Costs against the Council on the following ground:"Taking the above matters into consideration, I find that the Council by not acknowledging receipt of amended plans which would likely have overcome highway objections and was the only point of dispute between the parties combined with not engaging with the applicant during the application process has resulted in the wasted time and expense of lodging an appeal for the applicant." Permission having been granted and a full award of costs granted against Calderdale MBC for the replacement of a stable building to a house in the Green Belt.
The Council agreed that a stable fell within the definition of a previously developed site, but for it to be accepted as one of the permitted Green Belt exceptions the Council’s approach was confused and referred to a requirement for the proposed building ‘to be in the same use and not materially larger than the one it replaces’. The Inspector agreed that the Council had wrongly assessed the proposal against the relevant exception of the Framework.
The Inspector acknowledged that some domestication of the site’s appearance would doubtless arise, including that from parked vehicles and domestic paraphernalia, any effect on openness would be negligible on account of the scale of the accommodation that could be provided. The site’s raised position above the road is such that close views would be restricted. In longer views it would be seen in the context of the existing group of adjacent dwellings. Furthermore, any such effects would be of such a scale that they could be assimilated to preserve visual openness through suitable landscaping within the site.
In granting permission a full award of costs was granted on the grounds that the Council has failed to substantiate its refusal of planning permission. It has provided vague assertions about the development’s impact which are unsupported by any objective analysis. I find this constitutes unreasonable behaviour contrary to the guidance in the Framework and the PPG and the appellant has been faced with the unnecessary expense of lodging the appeal.